by jimbo » Fri Jul 10, 2009 10:59 am
i have acquired the same results and have asked before.
seems no one has an answer,
this is what i've been doing, some what reliable.
something for ya to expierement with.
when i get package down to about 2000, i reduce using fast minimizer, or minimizer 3-3, i;ve even tried remove, which changes my thinking and appraoch cause it does work sometimes.
or optimize quads, triples, sometimes removing instead of leaving does work pretty good.
like dont use optimize pair on a large package, wait till you get it down to around 200 seems to work when you optimize pairs and leave
reduce in small quantities like 250, till you get down to 1000. especially when using best tickets. try reducing and using alternate, been getting some pretty good results to a certain point.
then reduce by 100 till you get to 500
then reduce by 50 down to 300
then 25 t0 125
then by 5 or 10
write everything you do down, doing in certain order sometimes work better.
things i'm doing but still looking
jim